Converting a commercial property into a home is a common route to a Golden Visa at the €250,000 threshold. It works best when the notary, the lawyer and the civil engineer coordinate from the start. The legal team checks the title; the engineer handles the technical design and certifies that the property meets the specifications needed for the permit.

As we explain in our complete guide to the change-of-use Golden Visa, preparation is what matters most. A well-prepared file makes the final approval by the Ministry of Migration a routine step.

1. The Technical Survey

A technical check before you buy tells you whether the property is suitable. The engineer looks at three points:

A

Clear Ceiling Height (GOK vs NOK)

Clear internal height is the basic requirement for a space to count as a home. For buildings built under the older General Building Regulation (GOK), the minimum is 2.40 metres; for newer buildings under the 2012 New Building Regulation (NOK), it is 2.65 metres. Checking this early confirms whether the space (a former ground-floor shop, for example) can be lawfully converted.

B

In Line with the Building's Deed of Establishment

The change of use must be consistent with the building's regulations. Working directly with the notary, the engineer makes sure those regulations allow residential use, or do not expressly prohibit it. With that confirmed, you can buy knowing the conversion can go ahead without delays caused by third parties.

C

Regularising the Existing Layout

Commercial properties often differ slightly from their original plans (internal mezzanines, for example). The engineer records and regularises these differences early, so you receive a property that is fully "clean" and ready for its new use.

2. The Legal Framework & Key Investment Milestones

The current legal framework sets clear rules, and our team uses them to plan your project as efficiently as possible:

Timeline & Flexibility

The 5 April 2024 Milestone: Under Law 5100/2024, the change of use must be completed after 05.04.2024 for the property to qualify for the €250,000 threshold. That favours new investments and fresh projects.

Flexibility under JMD 214926/2025: The Joint Ministerial Decision (Government Gazette, Series B, No. 6014) clarified that the change of use can be carried out either by the current owner (before the contract) or by you, the new investor (after the transfer). You can therefore decide how to manage the renovation.

Long-Term Returns

The law steers these properties towards long-term letting: short-term rental such as Airbnb is expressly banned, and a breach means a €50,000 fine and the permit being revoked. Long-term letting gives a regular monthly income without the work of running a holiday let.

Talk to the Experts A successful investment starts with proper preparation. Contact us and we will review the property you are considering from a legal and notarial standpoint, together with your engineer.

3. The Planning Route: Fast and Efficient

Licensing a change of use is now digital and fast. Your engineer chooses the right route for your plans:

Approval of Minor Building Works (EEDMK)

The quicker and more flexible option. It covers projects with a budget of up to €25,000 that do not alter the load-bearing structure. The permit is issued quickly through the online system, so the works can start immediately.

Building Permit

If you plan major reconstruction with a budget above €25,000, the engineer handles the full Building Permit and sets a timeline for the works.

4. The Completion Certificate & Circular 1/2026: Final Certification

Once the conversion is complete, the engineer issues the electronic completion certificate, which formally confirms that the property is now a residence. This is the last step of the works.

The Administration's guidance has clarified the process. On 21 April 2026, the General Secretariat for Migration Policy issued Circular 1/2026, which clarifies how Article 100 of Law 5038/2023 applies and sets binding guidance for investors, lawyers and notaries.

The Circular gives the engineer's certificate a central role: it is now a prerequisite. The framework states expressly that the residence permit (Golden Visa) application cannot be filed early, but "will be submitted only AFTER the change of use has been completed and certified accordingly by the engineer".

In practice, this makes the process more predictable. We follow the binding guidance of Circular 1/2026 closely, so that your file is complete when it is submitted and the decision rests on documented requirements rather than subjective judgement.

For the full picture, we also recommend our detailed guide to the accepted payment methods, so that your funds are transferred as securely as the property is licensed.

5. Frequently Asked Questions (FAQ)

Yes. If it has the required clear ceiling height and enough natural light, the engineer can issue the change-of-use permit and turn it into a proper living space.

If your engineer prepares the file properly, the minor-works permit is issued quickly, usually within 10 to 20 working days.

No. The €250,000 threshold refers only to the purchase price (acquisition value) stated in the contract. Whatever you spend on renovation is added value on top.

To protect your investment at the €250,000 threshold, the notary and the engineer check the property's history under Circular 1/2026, confirming early on that no other investor has already used it for the same purpose.

Christina Pachou

Christina G. Pachou

Notary in Athens

Specialising in international law, cross-border transactions and tax matters. For estate agents and developers: timely notarial checks, fast completion and coordination with the legal advisers on each transaction.

  • ★ CROSS-BORDER TRANSACTIONS
Ilias Poulakos

Ilias P. Poulakos

Lawyer, LL.M

Worked in the United Kingdom for many years. Specialises in B2B agreements, NDAs and high-value cross-border transactions. Understands the needs of the international investor, with a focus on advising businesses in the Golden Visa sector.

  • ★ GOLDEN VISA EXPERTISE